My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 9/2/2017
>
Contracts
>
Capital Contract
>
Stellar J Corporation 9/2/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:40:29 AM
Creation date
10/19/2017 10:04:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
9/2/2017
Council Approval Date
8/9/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Portal 1 Replacement
Public Works WO Number
UP3602
Tracking Number
0000888
Total Compensation
$765,372.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/9/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> PORTAL 1 REPLACEMENT <br /> WO NO. —UP3602 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the Portal 1 Replacement will be received at the office of the City Clerk, 1st <br /> Floor Wall Street Building,2930 Wetmore,Everett,Washington 98201,until 2:00 p.m.on Tuesday,July 11 2017. At the <br /> appointed time,all bids will be opened and publicly read aloud in the 8th floor hearing room at the Wall Street Building. <br /> The engineer's estimate for this Project is$740,000. <br /> The completed work will provide Owner with a new Portal structure that connects an existing tunnel to an existing steel <br /> pipe spool that leads to a pipeline that extends to the diversion dam on the Sultan River. Retrofit measures are indicated on <br /> the project drawings and described in further detail in Section 011100—Summary of Work. <br /> Owner will conduct a Prebid meeting starting at 9:00 am, June 28, 2017 at the Water Filter Plant Headquarters Building, <br /> 6133 Lake Chaplain Road, Monroe, WA 98272. More information can be found in Document 00 25 13 —Prebid Meetings <br /> of the Project Manual. <br /> Plans, Specifications,Addenda, and plan holders list for this Project may be viewed on line at <br /> https://everettwa.gov/319/Bid-Opportunities. <br /> Plan sets may also be purchased at Bill's Blueprints(425)259-0859 at 2920 Rockefeller Avenue,Everett, WA 98201. <br /> For technical questions regarding this Project email John Nottingham,P.E.,Project Manager, City of Everett,at <br /> JNottingham@everettwa.gov. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid bond or <br /> certified check in an amount not less than five percent(5%)of the total amount of the Bid. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder may <br /> withdraw his Bid after the hour set for the opening thereof The City further reserves the right to make the bid award as <br /> deemed in the best interest of the City.The right is reserved by the City to postpone the award for a period of forty-five <br /> (45)days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to equal <br /> employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett,Washington. <br /> SHARON FULLER, CITY CLERK <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.