Laserfiche WebLink
INSPECTION REPORT <br /> Date'Z j;0 j k1Permit: <br /> Contractor: <br /> Owner: �� <br /> Site Address: 7Rr\(\ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ough In F-1Structural Slab F-1OK to insulate E]OK to insulate <br /> ervice F-1 Framing ❑Rooftop Units E]Water Service <br /> Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ,APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> [:] F1F]OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> L/ I <br /> re <br /> IyLCi Bey J( 14�0 <br /> �J <br /> Inspector: Date: <br /> EIR(10/06) DATABAR�ZC. <br />