My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 MELVIN AVE 2017-10-24
>
Address Records
>
MELVIN AVE
>
2022
>
2022 MELVIN AVE 2017-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 1:16:53 PM
Creation date
10/24/2017 1:16:51 PM
Metadata
Fields
Template:
Address Document
Street Name
MELVIN AVE
Street Number
2022
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br /> Date / _ 1/_ Permit: <br /> Contractor: N- 10V At <br /> Owner: _ ,,// <br /> Site Address: ,7QZZy� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing PIPE <br /> SITE WORK ❑Roof Nailing ou h Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid efri era ion ❑Rough in <br /> ❑Roof drains ❑Building Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 our notice required <br /> 1 � <br /> t <br /> 1L �D <br /> Inspector: Date: 7 - Z7 <br /> E I R(10/06) DATABA INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.