Laserfiche WebLink
INSPECTION REPORT <br /> Date: �L Permit: <br /> Contractor: �/I I�/ G��✓ V�' <br /> Owner: fW) <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final [I Medical Gas <br /> Ceiling Grid F1 Drywall Nailing El Plumbing Final <br /> Electrical Final E]Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final <br /> Win❑Gas Pipe inal �;(„❑HWT Final <br /> OTHER OR CONSULTATION: I� tom) w(/Y t j� OV1 wnv 41)W <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. El CORRECTION REQUESTED <br /> al <br /> FO <br /> E] <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) /�NgT_TcE RMS K Pk( n'.. 425/468-8900 <br />