Laserfiche WebLink
INSPECTION REPORT <br /> Date -7-7 Permit: ( 704'0 <br /> Contractor: 7-6'Z✓��� <br /> Owner: <br /> r � <br /> Site Address:-(c7_0 <br /> E OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDIN MECHANICAL PLUMBING <br /> ❑Temp Service R ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OKYQR C.O. ❑ VIOLATION <br /> TO PERFORM INSPECTION: <br /> ALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> c~- <br /> G'G�v��it S•� Tro _ em=u c�7�r c <br /> ------------- <br /> Inspector: Date: <br /> E I R(10/06) DATABAR,INC. <br />