Laserfiche WebLink
I Project: SE54XCO18 5710 Green St. <br /> TechnologyAssociates, Date: 03-02-2017 Salt Lake City, UT 84123 <br /> By: JH Tel, (801) 463-1020 <br /> Proposed Sector Equipment Configuration (Plan View) - <br /> Mk>,F4+EX ArH <br /> rR- <br /> ........ -------- <br /> ------------------------- <br /> ---------- --i –M-WMM&5-IPPAIkLAUreJK <br /> - ------—–-------- <br /> R'A't!E-C,I'YA PMELKJr-W.A <br /> All equipment will be attached to new 3"std pipes, mounted directly to the tripod posts No <br /> equipment will be attached to the unisbvt beam spans. <br /> Check Lateral Sesmmoc <br /> Total Weight (Mount+Equipment), W,:=1.2.679 1b=814.8 Ib <br /> Total Wind Load,F,,,,:=1068 Ib Lateral Seismic Force, Fp:=0.448 Wt=365 Ib <br /> if(F,,,,>Ft,,"Win(I Controls","Scismic Controls")="Wind Controls" <br /> Tripod Mount Support <br /> Critical Lateral Wind Loading (ASCE 7-10 Design Load Case: 1.21) + 1.OW) - <br /> F,,,:=381 1b+66 1b+60 Ib+30 Ib 537 Ib <br /> F. —110 Ib <br /> IV <br /> Fo I <br /> W:=99 Ib+60 1b+52 Ib+53 1b+46 1b+108 1b=418 Ib <br /> Page 2 of 4 <br />