Laserfiche WebLink
........ AW- <br /> ° ? Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTCj permit where the Wsystem meets the requirements listed <br /> In this Checklist.All project plans and supporting documentation rust he provided on site for the Inspector, <br /> __.. ro BE COMPLETED BY APPLICAN i------- <br /> Project infort-iation <br /> �_-- <br /> Property owner Name: _ 1 �y»c� <br /> [Day <br /> roject Address: 22..1$ Sr Parcel# � I °� `�? ' <br /> City: '`yWl " State; LAJ 21P: 9g,�t3) ! <br /> Phone: 3739 <br /> - <br /> Contractor Name _ A_F_ 5'&-4-ute..a Zio <br /> Contractor License 11: A-e,' 6F t2 03 4< <br /> Contractor pay Phone: __A61 `1 U 3-05-1•__ _ <br /> PV system description m o crr . <br /> (include manufacturer c1 7 2{5-1, <br /> and model It of PV <br /> modules and <br /> /'/ yCzVA <br /> Inverters): ._-..... <br /> Qeterralfle if y9t,it-project qualifies for expedited peri'iAU111g: <br /> Yes No <br /> 1. PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> town house not more than three stories above grade or detached accessory structure that ❑ <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2, Modules on pitched roofs do not exceed the highest point of the roof unless approved by <br /> El <br /> the local jurisdiction, <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, /12_1 ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's Instructions,[IRC M2302,2] <br /> 5. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to ❑ <br /> administer the electrical code,[IRC M2302.2] _ <br /> G. The installation shall meet the requirements of the international Fire Code as amended ❑ <br /> by WA State,[IRCM2302,2] <br /> 7, The PV system is designed for the wind speed of the local area,and will be installed per- <br /> the manufacturer's speclfications,[IRC M2302,2,1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot,[IRC M2302,2.1(2)] ❑ <br /> 9. Total dead food of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot. [IRC M2302.2,1(3)] .� ❑ <br /> Enter total dead load of system(lbs/ft'): 3,•7-1'—,..- <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed.[IRC M2302,2.1(4)] <br />