Laserfiche WebLink
r <br /> Proposed Site Information: <br /> 1. How will your project change the existing conditions? <br /> The existing gravel area will be paved with asphalt. Drainage patterns will not change. <br /> 2. Please provide the following quantities of proposed hard surfaces in square feet: <br /> Proposed Roof Area: None <br /> Proposed Other Hard Surfaces(pavement,gravel,etc.): <br /> 3,600 SF of existing gravel surface will be temporarily paved with asphalt. <br /> 3. How will you manage rooftop runoff after the project is completed? <br /> No rooftop runoff will occur. <br /> 4. How will you manage stormwater runoff from hard surfaces(driveways, paved pathways, <br /> patios,etc.)?Evaluate each type of hard surface separately. <br /> Existing drainage patterns, treatment and discharge will not change. Stormwater will <br /> flow south to an existing catch basin, go through an existing oil/water separator, and <br /> discharge through an existing outfall into the Central Marina basin. <br /> cn"Y or CVLftLTT 1 3200 Cedar Street I Everett, VUR,98201 1 125 25 7-8810 1everettwa.gov � �,f <br />