Laserfiche WebLink
COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 6 28/2017 <br /> Work Order # <br /> Service Order # <br /> Contact Person -�/��� ���{i'l/}, C.S Telephone # -36th 4fo oo"I <br /> Requested By <br /> Property Owner (Name) Jeffery Michaels <br /> Address: 2311 191h St City Everett Zip 98201 <br /> Installation Location In front of the above listed address. <br /> Installation type/description Remove and replace 12. Ix ' x q , concrete sidewalk <br /> 69 yds concrete (ab $98.50 per yd = $ 8 -- <br /> The following estimate is based upon the Street Division work group providing all labor and equipment. <br /> Itemized Cost Estimate: <br /> Labor & Benefits 0 <br /> Material 7 = <br /> Equipment Rental 0 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TOTAL - <br /> Prepared by: K.C. McAuliffe Date Estimate Prepared: 6/28/2017 <br /> Accepted by: Representing: <br /> (Signature) <br /> Please sign and return estimate to address above, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Estimate Only <br /> DO NOT SEND CHECK <br /> C:\Users\BSORGEN\Documents\Sidewalk Estimates\2311 19thStSidewalk!CUS'1'LS'1'1MATE SHEETI.docx <br />