My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6311 36TH AVE W JBC PRODUCT MANAGEMENT 2018-09-12
>
Address Records
>
36TH AVE W
>
6311
>
JBC PRODUCT MANAGEMENT
>
6311 36TH AVE W JBC PRODUCT MANAGEMENT 2018-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 9:55:39 AM
Creation date
10/26/2017 9:58:06 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6311
Tenant Name
JBC PRODUCT MANAGEMENT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> REG C6037_2,0117(0) '10,47 <br /> T.J. REG 1 0 17rd <br /> in <br /> W-.3 X <br /> 17050 <br /> (425) 257-8810 <br /> i'LCl $50.�0 <br /> $155-00 <br /> 1. <br /> r <br /> Plan Check No.: E1705-024 <br /> Application Date: 5/3/2017 <br /> Tenant: JBC PROPERTY MANAGEMENT <br /> Owner: POWDERMILL PHASE 1 LLC <br /> Job Address: 6311 36TH AVE W D-101 <br /> Proposed Use: COMMERCIAL <br /> Description of Work: ELECT FOR ROOFTOP UNITS, HVAC-JBC <br /> PROD MNG <br /> Plan Check Fee Paid: $tV�Vom) � 0 <br /> � <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> 5V S) 1:7 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.