Laserfiche WebLink
SHUTLER <br /> _�-CONSULTING JOB Powder Mill Bidg'D' <br /> ENGINEERS,Inc. SHEET NO. COVER OF <br /> CALCULATED BY)ch DATE 5/1/2017 <br /> 12503 Bel-Red Road,Suite 100 CHECKED BY DATE <br /> Bellevue,Washington 98005 SCALE <br /> (425)450-4075 FAX(425)4504076 JOB NUMBER 14-36.03 <br /> STRUCTURAL CALCULATIONS FOR: <br /> NEW HVAC UNIT-- <br /> JBC PROPERTY MANGEMENT <br /> POWDER MILL BLDG'D' <br /> EVERETT, WASHINGTON <br /> PROPOSED BY: HFq o f <br /> UNIVERSAL REFRIGERATION <br /> 4102 'B'PLACE N.W. <br /> AUBURN,WA 98001 0 <br /> (253)939-5501 t Li <br /> DESIGN CRITERIA: <br /> CODE.................................. INTERNATIONAL BUILDING CODE, 2015 EDITION <br /> ROOF LIVE LOAD................. 25 PSF SNOW LOAD, Is=1.0 <br /> WIND LOAD......................... 110 MPH ZONE, EXPOSURE'B', Iw=1.0 <br /> SEISMIC ZONE..................... SITE CLASS 'D', Sds=0.970, ap=2.5,Rp=6.0, Ip=1.0 <br />