My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/21 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:27:11 AM
Creation date
11/6/2017 9:26:02 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Complete Streets small projects(a new TIB[Transportation Improvement <br /> Board]program) <br /> o small program;$250k every two to three years <br /> Take steps to increase the use of transit,electric cars,and T4 Transportation -No work on electric cars. Transportation Services purchased two for the city rental fleet. <br /> ride-sharing Services -Extensive work on public outreach through"Everett in Motion"and other Commute Trip <br /> reduction initiatives. <br /> -Many public outreach activities included in the Long Range Plan effort to educate,inform <br /> and gather feedback. <br /> -Continued partnership with Everett Children's Museum to encourage transit use. <br /> -Distributed more than 2,000 promotional preloaded ORCA cards to community. <br /> Make it easier,safer,and more enjoyable to travel by T5 Public Public -The Master Plan prioritizes connections between existing bike facilities and three tiers of <br /> bicycle Works/Engineering Works/Streets, implementation. The Bicycle Master Plan is being implemented on the following levels: <br /> Parks,Public • Capital Projects(grant funded) <br /> Works/Permit o recent examples include: Broadway Bridge Replacement Bicycle Traffic <br /> Services Signal @ California,7`h Ave SE bike lanes,Holly Drive Bike lanes,W. <br /> Marine View Drive multiuse path,E.Grand to E.Marine View Drive <br /> multiuse path connection,112th Street SE Corridor Bike Lanes,etc. <br /> • Safety Projects(state traffic safety grants) <br /> o examples include: 36th Street Bike Lanes,19`h Street Bike Lane Signal <br /> detection <br /> • Complete Streets small projects(a new TIB[Transportation Improvement Board] <br /> program) <br /> o example: CBD Hoyt Bike Lanes to Interurban Trail connection <br /> • Development Requirements <br /> o examples include: Riverfront Business Park Shoreline Requirements <br /> • Annual Pavement Maintenance Overlay <br /> o adjustment of lane widths when restriping to implement design <br /> guidelines form Master Plan <br /> • City funded small works projects <br /> o example: Interurban Trail Bollard Replacement <br /> • Implementation by City Maintenance Forces <br /> o example: Hoyt Ave Signed Route(Alverson to CBD) <br /> S ( Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.