My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Exhibit A <br /> Continued <br /> • Endangered Species Act review <br /> • <br /> • Magnuson-Stevens Act review <br /> • National Historic Preservation Act(Section 106) <br /> • State Environmental Policy Act(SEPA) <br /> • Washington Department of Fish and Wildlife Hydraulic Project Approval (HPA) <br /> • Washington Dept. of Ecology Section 401 water quality certification <br /> • Washington Dept. of Ecology Construction Stormwater General Permit <br /> • Coastal Zone Management Consistency Determination <br /> • Shoreline development compliance,including flood hazard and critical areas regulations per the <br /> City of Everett Shoreline Management Program. <br /> Task 4.1 Permitting Support <br /> The Otak team will assist the City on behalf of DD5 with environmental permitting for the project <br /> with federal, state,and local regulatory agencies. Otak will prepare the Joint Aquatic Resources <br /> Permit Application QARPA) drawings to accompany the JARPA form.The City will complete the <br /> JARPA form with assistance as needed from Otak Otak will also prepare the Notice of Intent <br /> (NOI) for the Construction Stormwater General Permit(CSGP),and the Water Q,ality Monitoring <br /> and Protection Plan(WQMPP)that will be required for the Section 401 Water Qnality Certification <br /> from the Washington Department of Ecology. For all other required approvals/permits, support <br /> will be upon City request. • <br /> Deliverables: <br /> • JARPA Drawings, 8.5 x 11",electronic file (PDF format)to Corps'graphic standards,and <br /> Q,antities for JARPA <br /> • Notice of Intent(NOI) for the Construction Stormwater General Permit(CSGP) <br /> • Water Q,ality Monitoring and Protection Plan (WQMPP),electronic file (PDF format). <br /> Assumptions: <br /> • The City will complete and submit hard and digital copies of the JARPA form to the USACE, <br /> WDFW, and Ecology for the Section 404/10 permits,Section 401 permit,Coastal Zone <br /> Management Consistency Determination,and HPA. Otak will assist as needed to complete the <br /> JARPA form. <br /> • The City will coordinate with all regulatory agencies for permitting with assistance from Otak <br /> • The City will complete the SEPA Checklist with assistance from Otak. <br /> • The City will acquire all local permits required for compliance with the City of Everett shoreline <br /> management plan,flood hazard regulations,SEPA,and critical areas regulations,with assistance <br /> from Otak as needed. <br /> DD5 Dike Repairs and Improvements Project 5 <br /> 16 2 otak <br />
The URL can be used to link to this page
Your browser does not support the video tag.