My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Exhibit A <br /> Continued <br /> 5.1 Preparation of 90% Plans <br /> Otak will prepare 90%plans for the proposed dike repairs from the preliminary exhibits developed <br /> during Phase 1. Plans will be prepared to current City of Everett standards.An anticipated drawing <br /> list for the project is provided below showing the drawings that are anticipated at the 90%level. <br /> Plans will include a survey control plan,horizontal layout,vertical profile,section views,and details <br /> for the dike improvements. Plans will be prepared at a horizontal scale of 1"=20 feet and a vertical <br /> scale of 1"=5 feet.Details will be prepared at an appropriate scale to illustrate the level of detail <br /> needed for cicrity.The 90%civil plans will be coordinated and submitted to the City's project team <br /> for review. Review comments will be addressed and incorporated into the 100%plans. <br /> Deliverables <br /> • 90%Plans, five (5) hard copies at 11"x17"size,and electronic file (PDF file format). <br /> 5.2 Preparation of 90% Technical Specifications <br /> Otak will prepare technical special provisions,bid schedule,and assemble the project construction <br /> manual based on City standard"double-sided printing"format,Project Manual will include sections <br /> for contract and general/special provisions,bid proposal, contract, and applicable appendices. It is <br /> assumed that the City will provide the front-end contract(Division 0) for Otak to assemble the <br /> Project Manual. Specifications will be based on the City's standards and CSI standard specifications. <br /> Deliverables <br /> • 90%Project Construction Manual,electronic file (PDF file format). <br /> 5.3 Preparation of 90% Engineer's Estimate <br /> Otak will prepare the cost estimate to indicate quantity estimates and unit construction cost data to <br /> reflect the 90%level design. Quantities will be organized into standard bid items (supplemented by <br /> additional non-standard items,if necessary) conforming to the project bid schedule. Otak will <br /> estimate quantities and develop an itemized construction cost estimate using»nit costs based on <br /> experience and recent similar project bid tabs.The construction cost estimate will include <br /> appropriate contingencies to reflect the level of design complete. <br /> Deliverables <br /> • 90%Engineer's Estimate,electronic file (PDF file format). <br /> 5.4 Preparation of 100% Plans <br /> OTAK will prepare 100%level civil design plans for the proposed dike repairs. Plans will be <br /> prepared to current City of Everett standards.An anticipated drawing list for the project is provided <br /> below showing the drawings that are anticipated at the 100%level. Plans will be prepared at a <br /> DD5 Dike Repairs and Improvements Project 7 <br /> otak <br /> K\project\32700\32758\Contract\Phase2_Scope\Scope for Phase 2-DD5 dike rea64paU7_1010.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.