My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRC Scope of Work 3 of 4 <br /> 1 3 <br /> Project Deliverables <br /> CRC will provide the following project components as part of this cultural resources assessment. <br /> Task 1-Background Research $ 1,200.00 <br /> CRC will conduct a search of site files recorded at Washington Department of Archaeology and Historic <br /> Preservation (DAHP);review of relevant correspondence between the project proponent,stakeholders and <br /> DAHP;and,review of pertinent environmental,archaeological,ethnographic and historical information <br /> appropriate to the project area from a variety of available resources. <br /> Task 2-Tribal Contact $ 150.00 <br /> CRC will contact the cultural resources staff of tribes that may have an interest in the project area:This <br /> communication is intended to inform the cultural resources assessment and does not constitute government-to- <br /> government consultation. <br /> Task 3-Field Reconnaissance $ 875.00 <br /> CRC will provide a pedestrian survey of the project location for identification of archaeological and historical <br /> resources. Field methods will be consistent with DAHP guidelines. <br /> Task 4- Subsurface Testing (Contingent) $ 1,350.00 <br /> If suitable high-probability locations are identified in pedestrian survey,up to 10 hand excavated probes would be <br /> conducted to identify subsurface archaeological sites.Field methods will be consistent with DAHP guidelines. <br /> Task 5 -Documentation of Findings .Included above <br /> CRC will document and record archaeological and historic sites within the project area,including preparation of <br /> Washington State archaeological and/or historic,site(s) forms.Documentation will be consistent with DAHP <br /> standards. <br /> Task 6- Cultural Resources Assessment Report $ 1,300.00 <br /> CRC will prepare a technical memo describing background research,field methods,results of investigations,and <br /> management recommendations.The report will provide supporting documentation of findings,including maps <br /> and photographs,and will conform to DAHP reporting standards. Report and support materials will be provided <br /> electronically. <br /> *No cultural resources study can wholly eliminate uncertainty regarding the potential for prehistoric sites,historic <br /> properties or traditional cultural properties to be associated with a project.The information we will present within <br /> our reports is based on our years of experience and professional opinions derived from the analysis and <br /> interpretation of the documents,records,literature,and information we are able to identify and use within our <br /> report, and during our field investigation and observations to be conducted in the process of preparing our <br /> technical report.The conclusions and recommendations we present will apply to the project conditions existing at <br /> the time of our study and those reasonably foreseeable. <br /> Bal abs <br /> 1416 NW 46thISf.Ste 105 PMB346 <br />
The URL can be used to link to this page
Your browser does not support the video tag.