My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i.. <br /> • Conversion of Standard(canned)reports format from Crystal Reports XI to Crystal Reports 2013 <br /> (non-standard reports and custom reports are not included) <br /> • Remote web based training <br /> • Conversion of existing interfaces as identified in Appendix B <br /> • Conversion of required billing formulas <br /> • Technical Support <br /> Change Control <br /> Any changes to the project which impact project scope,schedule and/or costs must go through a Scope of <br /> Work Amendment process. A change must be identified by the Project Managers and any schedule, <br /> resources, risks and costs impacts assessed and documented. It is acknowledged that a change could <br /> potentially lead to a Scope of Work Amendment to this project or a separately defined project which must <br /> be approved by both Advanced and Everett. <br /> Timeline <br /> The effort included in this Scope of Work is for a timeframe not to exceed 7 months from the Project <br /> Kickoff, although this is subject to change based on the mutually agreed upon project plan. A Scope of <br /> Work Amendment may be required if project timeframe extends beyond 7 months. <br /> 5 l P a 4` <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.