My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ADVANCED DELIVERABLES: <br /> 1. Convert CIS Infinity Version 3 database to CIS Infinity Version 4 database <br /> 2. Deliver Data Validation Report which validates conversion accuracy between V3 and V4 <br /> 3. Review and deliver initial V4 data conversion load with Everett <br /> 4. Time the process to convert and Ioad data <br /> 5. Configure generic Information Bars <br /> EVERETI DELIVERABLES: <br /> 1. Review and approve the Data Validation Report <br /> 2. Run reports currently used by Everett for balancing system in V3 in V3 and V4 to confirm <br /> versions are in balance _ <br /> 3. Load refreshed Version 4 test database onto Advanced FTP site(required for troubleshooting and <br /> billing formula conversion) <br /> 4. Identify Baseline Accounts for testing <br /> S. Run CIS Infinity V4 Data Validation Tool to compare and validate V3 data. <br /> • <br /> -- <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.