My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r <br /> EVERETT DELIVERABLES: <br /> 1. Refresh Version 3 Test Environment from Version 3 Production Environment <br /> 2. Review and verify Data Validation Report <br /> 3. Configure filters/saved reporting criteria and hyperlinks <br /> 4. Execute test scripts and document results <br /> 5. Log and re- test issues <br /> 2. Integrated Testing Cycle (ITC) <br /> ITC is intended to exercise full scale testing of the system incorporating the testing of interfaces, <br /> including Infinity.Link. <br /> ADVANCED DELIVERABLES: <br /> 1. Deliver Interfaces including interface/repointing of Infinity.Link to Version 4 once <br /> installation is completed as 2°d phase of project. <br /> 2. Run V3 to V4 Conversion process and deliver Data Validation Report <br /> 3. Update conversion scripts, if required <br /> 4. Provide on-going issue resolution <br /> 5. Time the process to convert and load data <br /> EVERETT DELIVERABLES: <br /> 1. Refresh Version 3 Test Environment from Version 3 Production Environment <br /> 2. Review and verify Data Validation Report <br /> 3. Configure User Security <br /> 4. Deliver Custom Reports,if applicable <br /> 5. Execute end to end testing and document results <br /> 6. Log and re- test issues <br /> 3. User Acceptance Testing (UAT) <br /> The final phase of testing is UAT. Only critical path items will be altered during this phase as <br /> agreed upon by both parties after analyzing the risk of introducing these changes. Everett's team <br /> will test every billing cycle during this phase to ensure that every account calculates correctly. <br /> Everett will also perform identified processes in parallel in CIS Infinity Version 3 and in CIS <br /> Infinity Version 4 and compare the outcomes. <br /> 15I a <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.