My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/01/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/01/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:48:25 AM
Creation date
1/7/2016 11:48:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Water Main Replacement"P" Briefing COUNCIL BILL# <br /> Project Award Contract for the Proposed Action Originating Department PW/Utilities <br /> construction to Allied Consent Contact Person Richard Hefti <br /> Construction Associates,Inc. Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF January 6,2016 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> North Everett Call for Bids—March Bid Summary Public Works <br /> 19, 2014 <br /> Amount Budgeted $1,300,000.00 Fund No.: 336 <br /> Expenditure Required $954,839.80 Account Number(s): UP 3598 <br /> Budget Remaining $315,110.20 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Water Main Replacement"P"will replace approximately 950 feet of existing 4-inch diameter cast iron pipe <br /> within Forest Drive,north of West Mukilteo Boulevard; approximately 1,200 feet of 12-inch diameter cast <br /> iron pipe within Pacific Avenue,west of I-5; and approximately 330 feet of existing 6-inch diameter cast <br /> iron pipe east of I-5 and south of Pacific Ave. The project extends from the south side of West Mukilteo <br /> Boulevard to 4405 Forest Drive. The need for the Forest Drive project is to improve currently inadequate <br /> fire-flows, as noted in the 2007 Water Comprehensive Plan,by increasing the pipe to 8-inch diameter. The <br /> Pacific Avenue project extends from Hill Street to the I-5 southbound ramp. The need for this project is to <br /> replace this existing 12-inch diameter aging cast iron pipe that has broken three times in the past three years. <br /> The segment east of I-5 and south of Pacific Avenue is to meet the needs for the Polygon Development along <br /> Eclipse Mill Road. <br /> Bids were opened on December 8,2015, with 14 bids received. Allied Construction Associates, Inc. <br /> submitted the lowest responsive and responsible bid in the amount of$954,839.80. The highest bid <br /> submitted came in at$1,293,129.80. The Engineer's Opinion of Probable Construction Cost is $1,216,000. <br /> The budget remaining amount is arrived at by deducting the contracts for geotechnical($11,529), surveying <br /> ($16,521), advertising($2,000) and the low bid from the amount budgeted. <br /> There are no supplemental bidder requirements associated with this project. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award Contract for the construction of the Water Main Replacement"P"Project to Allied Construction <br /> Associates, Inc.in the amount of$954,839.80, including Washington State sales tax. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.