Laserfiche WebLink
INSPECTION REPORT I 2- s= <br /> Date: tC ( 2-4 Permit: l Q <br /> Contractor- <br /> Owner: 6a-n= tl C <br /> ��R� t \ /p <br /> Site Address: ?s W C e__ D -� <br /> TYPE OF INSPECTION REQUESTED <br /> CG ,nd <br /> L BUILDING MECHANICAL PLUMBING <br /> ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> rk ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> k <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED ❑OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) �S/ /VAT$�F RMS F I OMOTIONS 425/488-8900 <br />