Laserfiche WebLink
REQUEST FOR INFORMATION <br /> Boeing 40-53 New Engineering Conf Room (Project#6629.) <br /> TO: Boeing RFI # <br /> ATTENTION: Kathy Hale 9.0 <br /> FROM: Karisa Caracol PRIORITY Normal <br /> OTHER <br /> RECIPIENTS: <br /> CC: Bret Downing (Sellen Construction); Kevin Peterson (Sellen Construction); <br /> DATE REQUESTED: 12/16/2011 RESPONSE DEADLINE: 12/19/2011 <br /> REFERENCE: Walkway Minimum Width Requirement <br /> DISCIPLINE: Mechanical AREA: <br /> SPECIFICATION #: DRAWING : 1/A451, CWM20 <br /> ATTACHMENTS: <br /> REQUEST <br /> The specified ductwork location and the specified walkway placement overlap create a walkway surface that does not <br /> meet the minimum width requirements per attached inspection report and section 306.3 of the 2009 International <br /> Mechanical Code. <br /> Please advise. <br /> ORIGINATED BY: Sellen ORIGINATOR'S DOC <br /> #: <br /> ORIGINATED ON: 12/16/2011 IMPACT: To Be Determined <br /> RESPONSE <br /> I spoke to Bob Berlien about it. I-Ie and I agreed that the best way forward is to build up and cover the whole area <br /> above with FR Plywood capable of supporting one man. It will serve two purposes, one eliminate the minimum <br /> walkway surface, two it will make the conference rooms the two quietest conference rooms they have up in the 53 & <br /> 30 Upper Deck Area. <br /> We will require signage preventing people from storing things on this new lid;it will present a hazard to the area. <br /> Fredrik Bergstrom — 2011-12-19 <br /> RESPONSE BY: Fredrik Bergstrom DATE: 2011-12-19 <br /> 227 Westlake Ave. N. Tel (206) 682-7770 GENERAL CONTRACTING <br /> PO Box 9970 Fax (206) 623-5206 CONSTRUCTION MANAGEMENT <br /> SELLEN CONSTRUCTION Seattle, WA 98109 www.sellen.com CUSTOMER SERVICE GROUP <br />