My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 FERN RD 2017-11-28
>
Address Records
>
FERN RD
>
15
>
15 FERN RD 2017-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 7:37:20 AM
Creation date
11/17/2017 7:37:18 AM
Metadata
Fields
Template:
Address Document
Street Name
FERN RD
Street Number
15
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PuBr ic4or s gE PA11z11v1ENT MAILED MAS COPY �) r O p(/„���� <br /> egeUtilities Division,3200 Cedar Street t� 1 <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $869.00 Work Order# <br /> Cost of Service Order Service Order# <br /> Contact Person Joel Haack Telephone# 425 397-7360 <br /> Requested By Kirk Brooks Date of Request 6-15-2017 <br /> Property Owner(name) Haack Bros Const Inc <br /> Charge Cost to(name if different than owner) <br /> Address 3922 87th Ave City Marysville, WA Zip 98270 <br /> Installation Location 15 Fern Rd <br /> Installation type/description/size/etc. Replace existing .75 inch water service with new 1 inch. <br /> Estimate is for parts only City crew(s) to excavate, shore and restore. <br /> The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3”AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $827.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $.00 Matt Welborn <br /> Equipment Rental $.00 Randy Allen <br /> Paul McKee <br /> Tax $42.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $869.00 Benyam Stephanos <br /> Prepared by: ;. Ji S;o!.neDate Estimate Prepared 6/15/2017 <br /> Titvt <br /> Accepted by: f E, ���k Representing <br /> ' E GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\15 Fern Rd CEFP <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.