Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 11/7/2017 10:14 <br /> Issued By SJT2 SPOONER,JAMES T. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 8/22/2017 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 675 <br /> Program <br /> Title REPAIR 1 INCH 3615 GEYER LN 710119675 <br /> Work Order No 20172196 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 8/22/2017 Time 16:21 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> REPLACE EXISTING.75 INCH SERVICE WITH NEW 1 INCH METER, <br /> SETTER AND BOX. ALTERATION OF EXISTING SERVICE. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3494X019 WASRVC YES 8/25/2017 <br /> Address 3625 GEYER LN <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 3615 GEYER LN <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP36001047 ADAPTER 1 FCF X 1 IPS INSTA-TITE FEMALE COPPER FLARE 1 26.026 08/25/2017 PAP <br /> M ADAP36001247 ADAPTER 1 MIP X 1 IPS INSTA-TITE 3 80.514 08/25/2017 PAP <br /> M BOX000154447 BOX METER MOLDED PLASTIC W/DI LID 17"X 30" (LARGE) 2 334.668 08/25/2017 PAP <br /> M BUSH36065047 BUSHING HEX 2 X 1 NPT BRASS 2 23.244 08/25/2017 PAP <br /> M CORP36002947 CORP STOP 1 MIP X 1 COPPER FLARE 2 113.384 08/25/2017 PAP <br /> M COUP36006547 COUPLING 1 FEMALE COP SWIVEL X 1 COPPER FLARE 1/4 BEND ELBOW 1 30.788 08/25/2017 PAP <br /> M ELLO36102947 ELBOW 1 NPT 90 DEG BRASS(1/4 BEND) 1 5.329 08/25/2017 PAP <br /> M ELLO36144047 ELBOW 1 NPT 90 DEG STREET BRASS(1/4 BEND) 1 6.849 08/25/2017 PAP <br /> M METE36148347 METER 1 NEPTUNE W/E-CODER R9001 IN CU FT STUB ANTENNA 2 651.616 08/25/2017 PAP <br /> M NIPP36132247 NIPPLE 1 NPT X CLOSE BRASS 1 2.167 08/25/2017 PAP <br /> M NIPP38134347 NIPPLE 2 NPT X 6 BRASS 1 15.696 08/25/2017 PAP <br /> M PIPE36060747 PIPE 1 POLY IPS 200 PSI SIDR7 ASTM D2239 6 2.778 08/25/2017 PAP <br /> M SETT36033547 SETTER COPPER 1 HEIGHT15"LEG LENGTH 15"VI/HO 2 532.248 08/25/2017 PAP <br /> M TEEO38106747 TEE 2 NPT BRASS 1 - 23.685 08/25/2017 PAP <br /> Total Material Cost $1,849.01 <br /> Total Cost $1,849.01 <br />