Laserfiche WebLink
. • <br /> • <br /> ' , ;__ Residential Photovoltaic OTC Permit Application <br /> Ems: e_____ -",---F <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . In this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> Project Information <br /> Property Owner Narne: P...._o v-E- A--fit../ivio/1-U2A/in/ �a�Q4--P Carl c� Pev Divi T'ij f <br /> Project Address: ZZD`] �i bspn i Parcel# 00y I-0000001 <br /> City: tetra_—tt State: W A ZIP: g 3203 <br /> Day Phone: (i25) Zio - S3oy <br /> Contractor Name n-t -,01 0.j (.r-C, <br /> Contractor License#: W E STE 0 Z SU k) \1/4/V ESrES 'r 3 7 2. Dj <br /> Contractor Day Phone: (.3 i,6) r7 (o - 0 8S9 <br /> PV system description lzcv l:,, so lar. pv Sy s-1--v_m .±0 j in c i u at_ '- <br /> (include manufacturer <br /> and model#of PV — ('Z-) I-Lee. €1 --r9y goo SE ry,oclui.Lg. <br /> modules and — ( i ) )�e-i._ �r�erS1 S�l.e-c-t-h a. `7(oC0 3tvi nLI inve(t.' <br /> , Inverters): , — S► t\t(2o.cic_-. �Pv.-t-i,n, SyS-t-e-r-r <br /> Determine if your project qualifies for eupeclitec] permitting <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure thatIP ❑ <br /> is code compliant to setbacks and height, or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by [13 ❑ <br /> . the local jurisdiction. <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, A ❑ <br /> metal roofing, lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] lI ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to NI ❑ <br /> administer the electrical code. [IRC M2302.2] <br /> G. The installation shall meet the requirements of the international Fire Code as amended .® ❑ <br /> by WA State. [IRC M2302.2] <br /> 7, The PV system is designed for the wind speed of the local area,and will be installed per Q <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] . <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M23022.1(2)] 03 ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per.square foot. [IRC M 02.2.1(3)] 0 ' 1:1Enter total dead load of system (11)00: 2.3.3 lbs -F'2- <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of theEliI2' <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br />