Laserfiche WebLink
voir.,,,, INSPECTION REPORT <br /> ;tVDate 3 Permit:C(,0 (20.S —00 <br /> Contractor: <br /> 'Ali\C" Owner: t.--\-e-.110.—•--1, <br /> L\..( <br /> AASite Address: °(-- ___c: /— <br /> TYPE OF INSPECTION RE UESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ■ '>•ftop Units ❑Water Service <br /> ❑Grounding ❑Insulation 1 Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED 111�N <br /> 0�-, O'!!K FOR C.O. ❑ VIOLATION <br /> ABLE TO PERFORM INSPECTION: <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> tfa ist r t --c/5S <br /> Inspector: '✓ 7 /...--'''''''''-- -Date: LI �`GEIR(10/06) DA FkR,INC. <br />