My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600 HOLLY DR CHALLENGER ELEMENTARY SCHOOL 2017-12-20
>
Address Records
>
HOLLY DR
>
9600
>
CHALLENGER ELEMENTARY SCHOOL
>
9600 HOLLY DR CHALLENGER ELEMENTARY SCHOOL 2017-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 7:50:57 AM
Creation date
11/17/2017 12:05:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9600
Tenant Name
CHALLENGER ELEMENTARY SCHOOL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tqco <br /> SimplexGrinnell <br /> Scheduling <br /> Thank you for working with SimplexGrinnell on this project. We would like to take this opportunity to introduce you to the <br /> project team. Lyle Fortin is the SimplexGrinnell Project Manager(s) assigned to this project to help with generic project <br /> information. Chad McCammon is the project engineer to assist with drawings/engineering questions. Yvonne Thompson is <br /> available for scheduling technicians. <br /> Office: (206)291-1400 <br /> Fax: (206)291-1500 <br /> In an effort to assist you in your installation we require you to arrange a Pre-Construction meeting with one of our Technicians. <br /> This meeting will allow your field foreman to ask any questions they may have in regards to the installation of your system. <br /> Based on the equipment quantities and current scope of work our Technician will need no less than 4 business days to <br /> complete all necessary programming and commissioning from the time the below checklist is complete prior to any AHJ testing. <br /> Please make sure this time is allowed for in the General Construction CPM schedule as it can not be compressed. Change <br /> orders,change of scope,etc.may require additional time allotment to field personnel. <br /> Installation Checklist <br /> SimplexGrinnell is committed to providing the highest quality service available. As part of this service we want to ensure that <br /> the installation results in a trouble-free system. Please review the Checklist below and ensure each item is complete prior to <br /> our site visit. <br /> A Technician will be dispatched only after the below checklist items have been completed. If these items are not completed <br /> prior to the visit by our technician,you may incur additional charges not covered by our quotation. Please feel free to contact <br /> our office if you have any questions. <br /> o Fire Alarm Panel(s) have been mounted and all wiring (power, MAPNET, signal, door-holders, etc.) pulled into <br /> panel(s). <br /> o All wiring pulled into panel(s)or junction boxes have been permanently marked with wire markers and can easily <br /> be identified by a SimplexGrinnell Technician. <br /> o System Power is supplied and on a dedicated circuit(Do Not Energize prior to Technician visit). <br /> o All peripheral devices have been mounted(Smoke Detectors still covered). <br /> o All end-of-line resistors have been installed. <br /> o All alarm initiating circuits(smoke detectors,pull stations,etc.)have been checked for shorts,opens and grounds. <br /> o All alarm notification circuits(speakers,horns,strobes,etc.)have been checked for shorts,opens and grounds. <br /> o All remaining wiring(door-holders,FACP 24VDC,etc.)has been checked. <br /> o Flows,Tampers,and Pressure Switches installed,properly wired and adjusted. <br /> o All devices are properly protected against construction dust and contamination. <br /> o Contact us immediately if there is no digital dialer or system monitoring provisions already in place. The dialer, <br /> phone lines and service will be required for system testing. <br /> o There are no missing parts or equipment. <br /> Fire,Security,Communications,Workforce Solutions,Sales&Service <br /> Offices&Representatives in Principle Cities throughout the World <br /> G-13--"S—" <br />
The URL can be used to link to this page
Your browser does not support the video tag.