Laserfiche WebLink
4 <br /> s. I <br /> Precision General Commercial Contractors, Inc. <br /> RFI <br /> ENCLOSED <br /> Request for Information <br /> RFI #: 011 <br /> Date: 11.1.16 <br /> PROJECT: The Vintage at Holly Village Rehab <br /> 9615 Holly Dr. <br /> Everett, Washington <br /> TO: Pete Kanyer <br /> Nystrom Olson Architecture <br /> SUBJECT: Unique condition at deck framing at B12 stack <br /> The framing configuration of this set of decks is different from all the rest. Because <br /> QUESTION/COMMENT: of the cantilevered beams and their angles our typical framing process cannot work. <br /> Please advise. <br /> TRADES AFFECTED: Framing <br /> UGGESTED RESPONSE: Please respond with recommendation. <br /> SUBMITTED BY: Reid Patterson, Project Manager DATE: 11.1.2016 <br /> RESPONSE REQUESTED BY: 11.3.2016 <br /> RESPONSE: Revise beam to PT 8x10 HF #2 and cantilever beyond column. Please refer to SS-2. <br /> RESPONSE BY: Dennis Titus, PE, SE DATE: 12.07.16 <br /> Precision GCC, Inc./RFI/12232010/BLC <br /> a / <br />