Laserfiche WebLink
� � <br /> ��� <br /> December 30, 2014 <br /> Matt Reeves <br /> matt@zerasgroup.com <br /> RE: Owner: Everett Plaza <br /> Job Address: 5201 Evergreen Way <br /> Plan Check No: 61412-016 <br /> Dear Mr. Reeves: <br /> In response to your application for a construction permit, your plans have been examined an� <br /> you are advised that revisions may be necessary before a permit can be issued. Please review <br /> and respond to the comments below. These comments address building issues only. Additionat <br /> revisions, or additions, may be required by other departments (such as Utilities, Planning or <br /> Fire). All references refer to the 2012 International Building Code (IBC), the 2012 International <br /> Fire Code (IFC), the 2012 International Mechanical Code (IMC), and the 2012 Intemational <br /> Energy Conservation (IECC), as amended by the State of Washington and adopted by the City <br /> of Everett. The current IBC referenced standard for accessible design is the 2009 "Accessible <br /> and Usable Buiidings and Facilities" (ICC/ANSI A117.1). Federal ADA regulations and standards <br /> may be more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction <br /> documents reflecting the corrections requested. <br /> 1. IBC 2902.2 requires separate restroom facilities for each sex. <br /> If you have any questions, please call me aC 425-257-7264. <br /> Upon resubmittal of the drawings, your applicatian will be given priority and plan review will <br /> recommence. <br /> AII required submittals shall be of sufficient detail and contain su�cient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, �(�_ �� <br /> \Y�` <br /> �� <br /> Steve Miller <br /> Associate Engineer <br /> S llComxor�C!mm0.5MinaW la13-016�901 bcrErta���'e��,f.w <br />