My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 9/29/2017 Amendment 1
>
Contracts
>
Capital Contract
>
Granite Construction Company 9/29/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
12/6/2017 10:26:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
9/29/2017
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0000660
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 5/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Hot Mix Asphalt Asphalt Overlay-2017 <br /> Change Order No. 1 <br /> Change Order Effective Date: September 11,2017 <br /> Bid Item 15-24" Plastic Crosswalk Line. Modify bid item 15 entitled"24"Plastic Crosswalk Line" <br /> at the contract unit price of$10.00 per linear foot,by adding 1,070 linear feet to the contract, for an <br /> increase to the contract of$10,700.00. <br /> Bid Item 18-Plastic Line. Modify bid item 18 entitled"Plastic Line" at the contract unit price of <br /> $1.00 per linear foot,by adding 3,750 linear feet to the contract, for an increase to the contract of <br /> $3,750.00. <br /> Bid Item 19-Profiled Plastic Line. Modify bid item B19 entitled"Profiled Plastic Line"at the <br /> contract unit price of$1.50 per linear foot,by removing 1,750 linear feet from the contract,for a <br /> decrease to the contract of<$2,625.00>. <br /> Bid Item 22-Conduit Pipe,2"Diameter. Modify bid item 22 entitled"Conduit Pipe,2"Diameter" <br /> at the contract unit price of$23.00 per linear foot, by removing 600 linear feet from the contract, for a <br /> decrease to the contract of<$13,800.00>. <br /> Bid Item 23-Removing Concrete Sidewalk. Modify bid item 23 entitled"Removing Concrete <br /> Sidewalk"at the contract unit price of$87.00 per square yard,by removing 125 square yards from the <br /> contract, for a decrease to the contract of<$10,875.00>. <br /> Bid Item 24-Cement Concrete Sidewalk. Modify bid item 24 entitled"Cement Concrete Sidewalk" <br /> at the contract unit price of$217.00 per square yard,by removing 160 square yards from the contract, <br /> for a decrease to the contract of<$34,720.00>. <br /> Bid Item 25-Resolve Above Ground Conflicts. Modify bid item 25 entitled"Resolve Above Ground <br /> Conflicts"at the unit contract price of$1.00 per estimate,by increasing the units by 38,000, for an <br /> increase to the contract of$38,000.00. <br /> Bid Item 26-Uniformed Police Officer. Modify bid item 26 entitled"Uniformed Police Officer"at <br /> the contract unit price of$95.00 per hour,by adding 775 hours to the contract, for an increase to the <br /> contract of$73,625.00. <br /> Bid Item 27-Street Cleaning. Modify bid item 27 entitled"Street Cleaning"at the contract unit price <br /> of$205.00 per hour,by adding 232 hours to the contract,for an increase to the contract of$47,560.00. <br /> Bid Item 28-Portable Changeable Message Sign. Modify bid item 28 entitled"Portable Changeable <br /> Message Sign"at the contract unit price of$3.00 per hour,by adding 2300 hours to the contract, for an <br /> increase to the contract of$6,900.00. <br /> New Items <br /> New Item 101-Plastic ADA Symbol. Add unit price item 101 entitled"Plastic ADA Symbol"by <br /> adding 4 each to the contract, at the unit price of$160.00 per each,for an increase to the contract of <br /> $640.00. <br /> New Item 102-Overtime Flagging Premium. Add unit price item 102 entitled"Overtime Flagging <br /> Premium"by adding 75 hours to the contract, at the unit price of$71.00 per hour,for an increase to the <br /> contract of$5,325.00 <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.