Laserfiche WebLink
Table 1.Rough Order of Magnitude(ROM)Cleanup Cost Estimate <br /> Former Smith Street Sawmill Property <br /> 3600 Smith Avenue,Everett,Washington <br /> Description Unit Unit Cost Quantity Extended Cost <br /> RI,FS and CAP.. <br /> RI Work Plan Lump Sum $ 6,000 1 $ 6,000 <br /> Utility Locate LS $ 750 1 $ 750 <br /> Supplemental Assessment Test Pits Day $ 2,800 2 $ 5,600 <br /> Monitoring Well Installation Feet $ 129 75 $ 9,650 <br /> Soil Chemical Analysis Each $ 500 20 $ 10,000 <br /> Groundwater Chemical Analysis(2 rounds) Each $ 500 6 $ 3,000 <br /> Consultant Field Labor and Equipment Day $ 2,800 5 $ 14,000 <br /> Consultant Data Evaluation and Project Coordination Lump Sum $ 5,000 1 $ 5,000 <br /> Consultant RI and FS Report Lump Sum $ 20,000 1 $ 20,000 <br /> Cleanup Action Plan(CAP)and Engineering Design Report Lump Sum $ 15,000 1 $ 15,000 <br /> VCP Application,Request Ecology Opinion Letter on Proposed <br /> Cleanup Lump Sum $ 4,000 1 $ 4,000 <br /> Waste Designation and Permitting,Dispose of Investigative <br /> Waste Lump Sum $ 5,000 1 $ 5,000 <br /> Subtotal $ 98,000 <br /> Unit Unit Cost Quantity Extended Cost <br /> Remedial Excavation and Capping <br /> Contractor Mob/Demob,Health and Safety,TESC,SWPPP, <br /> SPCC,Permits,Survey** Lump Sum $ 9,500 1 $ 9,500 <br /> Contractor Excavate and Load** Cubic Yard $ 8 6,000 $ 48,000 <br /> Transport Contaminated Soil to Disposal Facility Ton $ 15 9,000 $ 135,000 <br /> Disposal Fees Ton $ 40 9,000 $ 360,000 • <br /> One UST Removal(Assumed) Lump Sum $ 10,000 1 $ 10,000 <br /> Contractor Import clean backfill,place,and compact** Ton $ 30 9,000 $ 270,000 • <br /> Contractor Asphalt cap Square Foot $ 7 2,500 $ 17,500 <br /> Chemical Analyses Excavation Soil Samples Each $ 600 25 $ 15,000 <br /> Consultant Oversight-Labor and Equipment Day $ 2,000 20 $ 40,000 <br /> Consultant Data Evaluation and Project Coordination Lump Sum $ 10,000 1 $ 10,000 <br /> Soil Cleanup Report Lump Sum $ 10,000 1 $ 10,000 . <br /> Subtotal $ 925,000 <br /> **If soil>MTCA cleanup levels remains on the property and is capped,Ecology may require that the NFA be contingent on <br /> filing a Environmental Covenant. <br /> Groundwater.Cleanup Confirmation and Regulatory Closure <br /> Compliance Monitoring Plan Lump Sum $ 3,000 1 $ 3,000 <br /> Soil gas/Indoor air evaluation LS $ 5,000 1 $ 5,000 <br /> Groundwater Sampling-3years Event $ 5,000 12 $ 60,000. <br /> Final Cleanup Report,EIM Database Lump Sum $ 8,000 1 $ 8,000 <br /> Client Communication and Meetings Lump Sum $ 5,000 1 $ 5,000 <br /> Communicate with Ecology re.NFA support Lump Sum $ 3,000 1 $ 3,000 <br /> Subtotal $ 84,000 <br /> Total $ 1,107,000 <br /> Contingency 25 % $ 279,850 <br /> Total with Contingency $ 1,386,850 <br /> Notes: This table should be used in conjunction with the attached Memo which presents limitations of this estimate. <br /> Date Prepared:December 2,2016;by GeoEngineers <br /> File No.0661.108-01 <br /> Table 1 I December 2,2016 Page 1 of i G EO E N G I N E E R 51 <br />