My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Utility District No 1 of Snohomish Co 11/29/2017
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Public Utility District No 1 of Snohomish Co 11/29/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
12/12/2017 9:30:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Utility District No 1 of Snohomish Co
Approval Date
11/29/2017
Council Approval Date
11/29/2017
Department
Public Works
Department Project Manager
Julie Sklare
Subject / Project Title
Henry M Jackson Hydroelectric Project
Tracking Number
0000946
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Project Facilities and Components <br /> fd 1111iM!!!!)", ,iiv + lhty ,„r„1111111101101111' <br /> Component ��'!�. Description Cost Share <br /> ";� ,� I.����,��;Ia Eligible <br /> Culmback Dam <br /> Original impoundment structure that forms the <br /> Culmback Dam Stage I western end of the Spada Lake Reservoir; completed I, <br /> 1965; capacity of 11 billion gallons, dam crest elev <br /> 1402' msl <br /> Raised impoundment structure that forms the western After City <br /> end of the Spada Lake Reservoir; completed 1984 Share of <br /> Culmback Dam Stage II (north bank stabilization completed 1990); added Stage II is <br /> capacity of 39 billion gallons, dam crest elev 1470' Due <br /> msl <br /> Valve Chamber Completed 1965; including Access Tower, elevator, <br /> hydroelectric generator, and all valve control systems <br /> Morning Glory Spillway Completed 1965 (elev 1360' msl) and raised in 1984 <br /> and discharge works (elev 1450' msl) <br /> Water Temperature Phase 1 Auxiliary System, Culmback Dam, <br /> Conditioning System completed 1984; Phase 2, WTC Tunnel System, N <br /> completed 2018 <br /> Control Building Including outlet valve controls, sensors, alarms, and I, <br /> backup diesel generator; completed 1984 <br /> Including storage tank, containment, sensors, and <br /> Diesel Storage Building alarms; completed 2015 (replaced underground Y <br /> storage tank) <br /> Protecting Dam, Spillway, and Valve Chamber <br /> Safety Boom Access Tower, completed 1965 <br /> Security Systems Including cameras, poles, sensors, recorders, and <br /> access control; completed 1984 <br /> Communication Including antennae, tower(s), cabling, and <br /> Systems equipment; completed 1984; updated 2016 <br /> Blue Mountain <br /> Communication Including road, structures, antennae, cabling, and <br /> Systems tower(s); completed 1984; updated 2016 <br /> Spada Lake <br /> Including shorelines, but not boat launches or <br /> Spada Lake Reservoir recreation sites; completed 1965 and volume Y <br /> increased in 1984 <br /> 2017 Amended Agreement(Henry M.Jackson Hydroelectric Project) Page A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.