My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3482-16
>
Ordinances
>
Ordinance 3482-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 10:12:55 AM
Creation date
3/8/2016 10:12:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3482-16
Date
2/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eliP(* Am <br /> ORDINANCE NO. 3482-16 EL/E/2ETT <br /> AN ORDINANCE creating the special construction fund entitled "South <br /> Precinct Roof Replacement Project", Fund 342, Program 022, authorizing <br /> the roof replacement at the South Precinct. <br /> WHEREAS, the City Council has recognized the need to replace the existing roof at the <br /> South Precinct located at 1121 SE Everett Mall Way. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: A special construction fund is hereby established as Fund 342, Program 022 <br /> entitled "South Precinct Roof Replacement Project" to accumulate the design and <br /> construction costs required to replace the existing roof. <br /> Section 2: Authorization is hereby granted to the Facilities/Property Management <br /> Director under the administration of the Mayor, to assume full responsibility for <br /> conducting all tasks and performing all necessary steps to accomplish the actions <br /> authorized by this Ordinance. <br /> Section 3: The estimated cost of the project, including costs related to design, <br /> construction, equipment, and contract administration shall be determined at the <br /> completion of design development. <br /> Section 4: The sum of $500,000.00 is hereby appropriated to Fund 342, Program 022 <br /> "South Precinct Roof Replacement Project". <br /> A. Use of Funds <br /> Design $ 50,000 <br /> Construction 440,000 <br /> Project Costs 10,000 <br /> Total $ 500,000 <br /> B. Source of Funds <br /> CIP 1 $500,000 <br /> C. The appropriation shall not lapse, but shall be carried forward from year to <br /> year until fully expended or the purpose has been accomplished or <br /> abandoned without the necessity of re-appropriation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.