Laserfiche WebLink
EXHIBIT A ' <br /> 3rd AVENUE S.E. SEWER IMPROVEMENT <br /> LID No . 729 <br /> PROJECT DESCRIPTION: <br /> Construction of standard gravity sewer mains, acquisition of <br /> easements , and necessary appurtenances and side sewer <br /> connections as determined by the City Engineer . <br /> The approximate locations of the sewer main constuction are <br /> detailed below: ** <br /> from the existing sewer main in 112th St . S.E. , North to <br /> approximately the center of the cul-de-sac in 3rd P1 . S.E. ; <br /> and <br /> from the Westerly terminus of the existing sewer main in <br /> 112th St . S.E. , North within the 3rd Ave. S.E. right-of-way <br /> approximately 550 feet; and <br /> from the Westerly terminus of the existing sewer main in <br /> 112th St . S.E. , West approximately 700 feet to the <br /> approximate centerline of 1st Ave. ; and <br /> from the intersection of 1st Ave. S.W. and 1st Dr . S.E. , <br /> South to connect to the proposed sewer main extention in <br /> 112th St . S.E. ; and <br /> from approximately 10 feet North of the South Line of Lot <br /> 35, Plat of Berg ' s Addition, within the 1st Dr . S.E. <br /> right-of-way, South to connect to the proposed main <br /> extention in 1st Ave. <br /> ** Final design and construction layout will be based upon <br /> plans and specifications approved by the City Engineer <br /> 0 9 6 8 e /c l o <br />