Laserfiche WebLink
PROVIDED, that during the 2018 Original Term Extension, the parties agree the <br /> currently available data, using the straight line methodology referenced in Section 7.1 to <br /> this Agreement, demonstrate that, for 2018, twenty-three and twenty hundredths percent <br /> (23.20%) of the District's Pump Electricity Operating Costs are attributable to additional <br /> surface water flow that comes into the Marshland Drainage Basin from Increased Hillside <br /> Runoff. <br /> Section 7 Subsection 9.3 "Amount of Increased Hillside Runoff Pump Plant Capital <br /> Improvement Fund Contribution"of the Original Agreement is amended to add the following: <br /> PROVIDED, that during the 2018 Original Term Extension, the parties agree as <br /> stated in Sections 7.2 and 7.3 above, currently available data demonstrate that, for 2018, <br /> twenty-three and twenty hundredths percent (23.20%) of the District's pump-related <br /> Operating Costs will be attributable to the additional surface water flow that comes into <br /> the Marshland Drainage Basin from Increased Hillside Runoff. Accordingly, the parties <br /> agree it is appropriate for the calendar year 2018,to allocate responsibility for twenty-three <br /> and twenty hundredths percent (23.20%) of the annual Pump Plant Capital Improvement <br /> Fund Contribution to the Upland Area. Twenty-three and twenty hundredths percent <br /> (23.20%) of Forty-Four Thousand One Hundred Forty Six Dollars ($44,146) equals <br /> approximately Ten Thousand Two Hundred Forty Two Dollars ($10,242). This amount <br /> shall be referred to as the "Increased Hillside Runoff Pump Plant Capital Improvement <br /> Fund Contribution for 2018." <br /> Section 8 Subsection 9.4 "Amount of the County's Increased Hillside Runoff Pump <br /> Plant Capital Improvement Fund Contribution Payment"of the Original Agreement is amended to <br /> add the following: <br /> PROVIDED, that during the 2018 Original Term Extension, the parties agree that <br /> the County's proportionate share of the Increased Hillside Runoff Pump Plant Capital <br /> Improvement Fund Contribution for 2018 shall be equal to sixty-nine percent(69%). Sixty- <br /> nine percent (69%) of Ten Thousand Two Hundred Forty Two Dollars ($10,242) equals <br /> approximately Seven Thousand Sixty-Seven Dollars($7,067). Accordingly,the"County's <br /> Increased Hillside Runoff Pump Plant Capital Improvement Fund Contribution Payment" <br /> shall be equal to Seven Thousand Sixty-Seven Dollars ($7,067). <br /> Section 9 Subsection 9.5"Amount of the City's Increased Hillside Runoff Pump Plant <br /> Capital Improvement Fund Contribution Payment" of the Original Agreement is amended to add <br /> the following: <br /> PROVIDED, that during the 2018 Original Term Extension, the parties agree that <br /> the City's proportionate share of the Increased Hillside Runoff Pump Plant Capital <br /> Improvement Fund Contribution for 2018 shall be equal to thirty-one percent (31%). <br /> Thirty-one percent (31%) of Ten Thousand Two Hundred Forty Two Dollars ($10,242) <br /> equals approximately Three Thousand One Hundred Seventy-Five Dollars ($3,175). <br /> Accordingly,the"City's Increased Hillside Runoff Pump Plant Capital Improvement Fund <br /> Contribution Payment" shall be Three Thousand One Hundred Seventy-Five Dollars <br /> ($3,175). <br /> AMENDMENT NO. 1 TO INTERLOCAL AGREEMENT <br /> REGARDING HILLSIDE RUNOFF IN THE MARSHLAND <br /> DRAINAGE BASIN DUE TO UPLAND DEVELOPMENT Page 3 of 11 <br />