My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshland Flood Control District 10/11/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
Marshland Flood Control District 10/11/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 9:08:06 AM
Creation date
12/14/2017 9:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshland Flood Control District
Approval Date
10/11/2017
Council Approval Date
10/11/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Jim Miller
Subject / Project Title
Hillside Runoff In Marshland Drainage Basin
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$30,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Increased Hillside Runoff Pump Electricity Operating Costs, as calculated in Section <br /> 7.3 and Section 8 above. <br /> Section 14 Section 19 NOTICES of the Original Agreement is deleted and replaced <br /> with the following: <br /> 19. NOTICES <br /> Each notice, demand, request, consent, approval, disapproval, designation or other <br /> communication that is permitted or required to be given by one party to another party under <br /> this Agreement shall be in writing and shall be given or made or communicated by <br /> (i) United States registered or certified mail, postage prepaid, return receipt requested, <br /> (ii) any nationally recognized overnight carrier or express mail service (such as FedEx or <br /> DHL) that provides receipts to indicate delivery, (iii) by personal delivery, (iv)by <br /> facsimile(with proof of successful transmission)or by email(with a request for and receipt <br /> of proof of successful transmission). All such communications shall be addressed to the <br /> appropriate Administrator of this Agreement as follows: <br /> To the County: To the City: <br /> Snohomish County The City of Everett <br /> Department of Public Works Public Works Department <br /> Surface Water Management Division Surface Water Section <br /> 3000 Rockefeller Avenue, M/S 604 3200 Cedar Street <br /> Everett, WA 98201 Everett, WA 98201 <br /> Attention: Gregg Farris, Attention: Heather Griffin, <br /> SWM Planning Manager Surface Water Manager <br /> Telephone: (425) 388-6454 Telephone: (425) 257-8889 <br /> Facsimile: (425) 388-6455 Facsimile: (425) 257-8882 <br /> Email: GFarris@snoco.org Email: HGriffin@everettwa.gov <br /> To the District: <br /> Marshland Flood Control District <br /> 125 Union Avenue <br /> P.O. Box 85 <br /> Snohomish WA 98291-0085 <br /> Attention: Gary Brandstetter, Sec/Mgr <br /> Telephone: (360) 568-6044 and/or(425) 760-4262 <br /> Facsimile: None <br /> Email: marshlandfloodcontrol@gmail.com <br /> Any party hereto may,by reasonable notice to the other parties, designate such other <br /> address, facsimile telephone number or email for the giving of notices as deemed <br /> necessary. All notices shall be deemed given on the day each such notice is personally <br /> delivered, transmitted by facsimile (with evidence of receipt), or delivered by overnight <br /> AMENDMENT NO. 1 TO INTERLOCAL AGREEMENT <br /> REGARDING HILLSIDE RUNOFF IN THE MARSHLAND <br /> DRAINAGE BASIN DUE TO UPLAND DEVELOPMENT Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.