My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak Inc 10/30/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
Otak Inc 10/30/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 9:16:48 AM
Creation date
12/14/2017 9:16:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc
Approval Date
10/30/2017
Council Approval Date
10/25/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Halley Kimball
Subject / Project Title
DID 5 Downstream Dike Repair Design
Public Works WO Number
UP3652
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$409,443.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRC Scope of Work 2 of 4 <br /> Project Assumptions <br /> *This scope and budget is based upon information provided on 29 August 2017. Any changes may require a <br /> change in budget to accommodate updating project information not received prior to the start of this project. <br /> *This scope and budget is based upon the project as shown on the attached map. <br /> *This scope and budget is based upon the assumption that CRC's current levels of insurance liabilities are <br /> sufficient for this project (sample certificate of insurance attached). <br /> * This budget assumes the client will provide utility locator services,per Washington State Law (RCW 19.122), <br /> prior to CRC field investigations. <br /> *This scope and budget assumes the property is clear of excess vegetation so that CRC archaeologists will be able <br /> to walk appropriately spaced transects with minimal path clearing. <br /> * This scope assumes that no more than one unrecorded archaeological site or one unrecorded historic site will be <br /> identified within the project area. It would be necessary to adjust the budget if additional sites are found.This <br /> budget was prepared with the assumption that no more than ten (10) auger test probes would be excavated. If <br /> extensive archaeological deposits are encountered or if additional shovel test probes are warranted within the <br /> project area it may be necessary to modify this agreement to accommodate additional investigations for purposes <br /> of site identification. <br /> * This scope assumes that all relevant project information, prior reports including geotechnical reports, <br /> historic/architectural reports,design plans, and project maps in addition to relevant project correspondence with <br /> DAHP or other agencies requesting this assessment and/or Tribal cultural resources staff will be provided with <br /> the signed Agreement so that CRC may begin this project immediately upon receipt of signed agreement. <br /> * This scope does not include additional services for impact mitigation regarding archaeological or historic sites. <br /> * This scope assumes that no meetings with clients and/or stakeholders will be required. <br /> * This scope assumes that project proponents can provide immediate Right Of Entry to CRC so the project may <br /> be completed within the stated project schedule. <br /> * This scope assumes that the property is safe for CRC archaeologist to enter and free of contaminants,health <br /> hazards and other unsafe working conditions. <br /> * If human remains are found within the project area, all CRC field investigations will cease immediately,proper <br /> authorities will be notified and CRC will not resume field investigations until applicable state laws are addressed. <br /> * CRC assumes the client will submit our report to DAHP (cover page provided;however, the client should <br /> include their own cover letter requesting review) within 15 days of receipt of said report for review. CRC cannot <br /> be held liable for reports prepared but not submitted to DAHP in a timely manner. Additional fees may apply for <br /> additional services required as part of DAHP's review process for reports submitted after 15 days of receipt. <br /> Ballard Labs <br /> 1416 NW 46th St,Ste 105 PMB346 <br /> Cultural Resource Consultants Seattle,WA 98107 206 855-9020-www.crcwa.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.