Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />Call for Bids for the <br />Briefing <br />COUNCIL BILL 4 <br />Expenditure Required <br />construction of Sewer M <br />Proposed Action <br />Originating Department <br />Public Works <br />Project, Phase 2 <br />Consent <br />Contact Person <br />David Voigt <br />Action <br />Phone Number <br />425-257-8983 <br />First Reading <br />FOR AGENDA OF <br />March 2, 2016 <br />Second Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location <br />Preceding Action Attachments Department(s) Approval <br />Northwest Everett <br />Call for Bids Phase 1, Project Area Map Public Works <br />November 12, 2014 <br />Amount Budgeted <br />$6,000,000 <br />Expenditure Required <br />$5,650,000 <br />Account Number(s): UP 3470 <br />Budget Remaining <br />$350,000 <br />Additional Required <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />This Phase 2 project will replace numerous old and deteriorated sewers and will further extend the separate <br />storm water system to control combined sewer overflows (CSO) at Puget Sound Outflow (PSO) One, PS02 <br />and PS03 sufficiently to comply with regulatory requirements. This project is listed on the Agreed Order <br />with Washington Department of Ecology for completion by the end of 2017. <br />The overall project is building a new network of separate storm water drainage pipes to partially separate <br />storm water from approximately 112 acres of residential area. <br />The Grand Avenue Park Bridge is needed to furnish offsite conveyance of separated Storniwater and CSO <br />overflows to Port Gardner. <br />RECOMMENDATION (Exact action requested of Council): <br />«uthorize a Call for Bids for the construction of Sever M Project, Phase 2. <br />15 <br />