My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3484-16
>
Ordinances
>
Ordinance 3484-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 9:40:36 AM
Creation date
3/16/2016 9:40:33 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3484-16
Date
3/2/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41. Accessory buildings which exceed one thousand square feet in area as provided by Section <br /> 19.07.020(M); <br /> 42. Accessory buildings which exceed fifteen feet in height as provided by Section <br /> 19.07.020(J); <br /> 43. Rockeries and retaining walls retaining soil (fill) four feet or greater in height in required <br /> building setback areas, as provided by Section 19.39.150(C)(5)(d); <br /> 44. Use of basement or other building spaces for uses not specifically listed as permitted use in <br /> the B-3 as provided by Section 19.22.030; <br /> 45. Buffer management as provided by Section 19.37.060(B)(2); <br /> 46. Removal of nonhazardous trees as provided by Section 19.37.060(B)(3)(c). <br /> * SEPA threshold determinations frequently include mitigation requirements as provided for in <br /> the SEPA ordinance (Chapter 20.04). Any SEPA condition based on SEPA substantive authority <br /> as provided for in the SEPA ordinance (Chapter 20.04) shall be identified in the land use permit <br /> decision, as provided in this integrated local project review process. <br /> ** An open public hearing may be required under the following circumstances, in which case <br /> the application shall be processed under Review Process III: (i) a public hearing is required by <br /> Title 18; (ii) any affected person files a written request for a hearing with the planning <br /> department within twenty-one days of the notice of application (public comment period); or(iii) <br /> either prior to or within the public comment period, the director or the city engineer and/or their <br /> designees require an open public hearing. <br /> Is hereby amended to read as follows: <br /> Decisions included. <br /> A. Review Process II applications include the following administrative decisions:* <br /> 1. Alteration of a designated significant feature within an historic overlay zone; <br /> 2. Alteration of category II and III streams as provided by Section 19.33D.500(B)(2); <br /> 3. Atrium appurtenance approval as provided by Section 19.39.040(B)(2); <br /> 4. Buffer width reduction for streams (Sections 19.33D.490(D) and 19.37.170(C)) or wetlands <br /> (Sections 19.33D.450(E) and 19.37.110(C)) or alteration of geologically hazardous areas or <br /> standard buffer (Section 19.37.080(C)) if proposal is not categorically exempt under SEPA; <br /> 5. Change or expansion of a nonconforming use (up to twenty-five percent) as provided by <br /> Section 19.38.030(C) and (D); <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.