Laserfiche WebLink
centerline of the Snohomish River Waterway to its intersection with the <br /> southeasterly projection of the south line of Lot 27, Plat of Everett Tide Lands, <br /> Section NO. 3; THENCE northwesterly along the said projected south line of Lot <br /> 27, Plat of Everett Tide Lands, Section NO. 3, and its northwesterly projection <br /> thereof, to its intersection with the north line of the SW1/4, SE1/4 of Section 32, <br /> Township 29N, Range 5E, W.M.; THENCE westerly along the north line of the <br /> SW1/4, SE1/4 of Section 32, Township 29N, Range 5E, W.M. to the center <br /> section line of said Section 32, Township 29N, Range 5E, W.M.; THENCE <br /> northerly along the center section line of Section 32, Township 29N, Range 5E, <br /> W.M. to its intersection with the south section line of Section 29, Township 29N, <br /> Range 5E, W.M.; THENCE northerly along the center section line of Section 29, <br /> Township 29N, Range 5E, W.M. to its intersection with the southeastern right-of- <br /> way line of Washington State Route 5 (aka Interstate 5); THENCE northerly <br /> along the eastern right-of-way line of Washington State Route 5 (aka Interstate <br /> 5) to the Point of Beginning. <br />