My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/11/15 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/11/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 9:54:58 AM
Creation date
12/20/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> LAKE CHAPLAIN ROAD AND CULVERT PROJECT <br /> CITY OF EVERETT <br /> GEOTECHNICAL ENGINEERING,HYDRAULIC ENGINEERING,AND PERMITTING SE«VICES <br /> SCOPE OF ADDITIONAL SERVICES DURING CONSTRUCTION <br /> OEOENOINEERS JOB NO.0661-107-00 <br /> GeoEngineers, Inc. is pleased to present our scope for additional engineering consultation during <br /> construction of the Lake Chaplain Road and Culvert project to replace an existing 6-foot span by 4-foot rise <br /> pipe arch culvert along Woods Lake Creek,a tributary to the Sultan River,which flows under Lake Chaplain <br /> Road. Additional engineering consultation services are requested during construction to support the City <br /> and contractor during foundation preparation, stream placement, permitting, and additional dewatering <br /> efforts. Based on our discussions,we estimate our additional services will include the following tasks: <br /> 1. Provide additional consultation to response to contractor earthwork and grading issues,stream bed <br /> materials,and slope construction. <br /> 2. Complete site visits on an as-requested basis to confirm conditions encountered and constructed <br /> are as assumed during design and provide alternate recommendations as needed. This includes <br /> recommendations for culvert foundation preparation, backfill and slope construction, permanent <br /> drainage considerations,and streambed materials and placement. <br /> 3. Project management, coordination and communications, <br /> A breakdown of our labor hours and estimated fee for the above tasks is provided in attached Exhibit B. <br /> We appreciate the opportunity to provide continued services on the Lake Chaplain Culvert project. Please <br /> call if you need additional detail or if you have any questions regarding the project, our services, or the <br /> estimated budget. <br /> 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.