|
4
<br /> �i Exhibit C Pagelof3
<br /> a
<br /> Equipment
<br /> Air Sparging Feld Test,per day— _ ______ ___.__ . __$__ __ __ 100.00 ?7
<br /> Air/Vapor Monitoring Equipment(PID,5-Gas Meter),per day $
<br /> 100.00
<br /> Asbestos Sample Kit —
<br /> $ 25.00
<br /> Blastmate,per day $ 60.00
<br /> • D&M Sampler,per dam_ —__-. $ __..- 80.00
<br /> DO(Dissolved Oxygen)Kit $ 20.00
<br /> Dynamic Cone Penetrometer,per day _ $ 40.00
<br /> E Tape(Electric Tape),per day
<br /> 25.00
<br /> Field Data Acquisition Equipment ... ..-- _-- $ 50.00
<br /> Field Gear/Reconnaissance,per day $ 50.00
<br /> i Gas Detection Meters,per day
<br /> 100.00
<br /> Generator,per day $ 100.00
<br /> Groundwater Pressure Transducer w/Datalogger,per day .
<br /> Groundwater Pressure Transducer w/Datalogger,per week $ 200.00
<br /> • Hand Auger,per day
<br /> Inclinometer Probe,per day,1/2 day minimum _ _ _-__ ___— _ ._ $_-_. 200.00
<br /> Interface Probe,per day _.._. 50.00
<br /> Iron Test Kit $ 20.00
<br /> Laser Level,per day
<br /> 50.00
<br /> Low Flow Groundwater Sampling Equipment,per day $ 225.00
<br /> Muitiparameter Water Quality Meter,per day_ — _ --_. __--__- .---_$ _ 80.00
<br /> Nuclear Density Gage,per hour,1/2 day minimum —_ _._____ _ __.-$ 10.00
<br /> Peristaltic Pump,per day _--. 50.00
<br /> pH Probe,per day
<br /> $ 15.00
<br /> PID,FID or OVA,per day $ 100.00
<br /> Saximeter,per day__
<br /> Scuba Diving Gear,per day/per diver
<br /> $ .250.-0-0
<br /> Shallow Soil Exploration Equipment,per day —_ $ • `0.00
<br /> Soil Field Screening Equipment,per day
<br /> Soil Sample Kit
<br /> Steam Flow Meter,per day_ —_ —
<br /> Strain Gauge Readout Equipment,per day
<br /> 50.00
<br /> Surface Water FlowMeter,perday,l/2 dg minimum -------- --- ..--- $-- . 50.00
<br /> Surface Water Quality Monitoring Equipment,per day _ $ 50.00
<br /> __ Turbidity Meter,per day—_ _. _ _--_._.. _
<br /> Vehicle usage,per mile,or$50/day,whichever is greater $ 0.65
<br /> Specialized and miscellaneous field equipment,at current rates,list available upon request
<br /> OTHER SERVICES,SUPPLIES AND SPECIAL TAXES
<br /> Charges for services,equipment,supplies and facilities not furnished in accordance with the above schedule,and any unusual
<br /> items of expense not customarily incurred in our normal operations, are charged at cost plus 15 percent This includes
<br /> shipping charges, subsistence, transportation, printing and reproduction, miscellaneous supplies and rentals, surveying
<br /> services,drilling equipment,construction equipment,watercraft,aircraft,and special insurance which may be required.Taxes
<br /> required by local jurisdictions for projects in specific geographic areas will be charged to projects at direct cost
<br /> Per diem may be charged in lieu of subsistence and lodging.
<br /> Routinely used field supplies stocked in-house by GeoEngineers,at current rates,list available upon request
<br /> In-house testing for geotechnical soil characteristics at current rates,list available upon request
<br /> Associated Project Costs(APC)
<br /> Computer hardware and software, telephone and fax communications, printing and photocopying and routine postage via
<br /> USPS will be charged at a flat rate of 6 percent of labor charges. These charges are labeled as Associated Project Costs(APC).
<br /> All rates are subject to change upon notification.
<br /> 1 6 7 GEO Itm➢Gl"TI'°EERS_
<br />
|