My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1516-88
>
Ordinances
>
Ordinance 1516-88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2017 11:54:48 AM
Creation date
12/21/2017 11:54:46 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1516-88
Date
8/24/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Southpoint Signal Improvements, Program 981 • <br /> Preliminary Engineering <br /> W.O. 2183 $10,000 <br /> Construction <br /> W.O. 2184 30,000 <br /> Total Estimated Cost, Program 981 40,000 <br /> 4 <br /> Total Estimated Project Cost, Fund 322 $140,000 <br /> B. Source of Funds <br /> 1. Evergreen Way North Signal Improvements, Program 980 <br /> a. Preliminary Engineering <br /> W.O. 2181 <br /> Exxon Oil Rebate $18,000 <br /> 1/2V Gas Tax 2,000 <br /> Subtotal $ 20,000 <br /> b. Construction - W.O. 2182 <br /> Exxon Oil Rebate $72,000 <br /> 1/2V Gas Tax 8,000 <br /> Subtotal 80,000 <br /> Total Funds, Program 980 $100,000 <br /> 2. Southpoint Signal Improvements, Program 981 <br /> a. Preliminary Engineering <br /> W.O. 2183 <br /> Exxon Oil Rebate $ 9,000 <br /> 1/2V Gas Tas 1,000 <br /> 10,000 <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.