Laserfiche WebLink
2. Southpoint Signal Improvements, Program 981 • <br /> Preliminary Engineering <br /> W.O. 2183 $10,000 <br /> Construction <br /> W.O. 2184 30,000 <br /> Total Estimated Cost, Program 981 40,000 <br /> 4 <br /> Total Estimated Project Cost, Fund 322 $140,000 <br /> B. Source of Funds <br /> 1. Evergreen Way North Signal Improvements, Program 980 <br /> a. Preliminary Engineering <br /> W.O. 2181 <br /> Exxon Oil Rebate $18,000 <br /> 1/2V Gas Tax 2,000 <br /> Subtotal $ 20,000 <br /> b. Construction - W.O. 2182 <br /> Exxon Oil Rebate $72,000 <br /> 1/2V Gas Tax 8,000 <br /> Subtotal 80,000 <br /> Total Funds, Program 980 $100,000 <br /> 2. Southpoint Signal Improvements, Program 981 <br /> a. Preliminary Engineering <br /> W.O. 2183 <br /> Exxon Oil Rebate $ 9,000 <br /> 1/2V Gas Tas 1,000 <br /> 10,000 <br /> - 2 - <br />