My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1505-88
>
Ordinances
>
Ordinance 1505-88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 10:21:04 AM
Creation date
12/28/2017 10:20:57 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1505-88
Date
7/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
softball fields; and (4) acquisition of property for park <br /> development at Silver Lake, all as further described in Section 2 <br /> hereof. <br /> (m) "Projects Fund" means the "1988 Parks and Library <br /> Projects Fund" created by Section 14 hereof. <br /> (n) "Rebate Amount" means the amount determined pur- <br /> suant to Section 9 hereof with respect to the Bonds which is to be <br /> rebated to the United States under the circumstances set forth <br /> therein. <br /> (o) "Treasurer" means the Treasurer of the City, or any <br /> successor to the functions and responsibilities of the Treasurer <br /> of the City. <br /> SECTION 2 . Authorization of Projects and Findings. The City <br /> hereby adopts the following plan of improvements for park, library <br /> and museum facilities of the City, to-wit: <br /> (a) Improvements to Walter E. Hall Soccer Field, <br /> including drainage, site preparation and seeding. <br /> (b) Acquisition of real property adjacent to existing <br /> City library to be used for expansion of library and development <br /> of a civic center. <br /> (c) Improvements to Kasch soccer and softball fields. <br /> (d) Acquisition of real property at Silver Lake to be <br /> utilized for park purposes. <br /> Such improvements shall be collectively designated herein as <br /> the "Projects. " <br /> The cost of all necessary architectural, engineering and <br /> other consulting services, inspection and testing, administrative <br /> and relocation expenses and other costs incurred in connection <br /> with the making of the foregoing capital improvements shall be <br /> deemed a part of the costs of such improvements. Such improve- <br /> ments shall be complete with all necessary furniture, equipment <br /> and appurtenances. The estimated cost of the Projects and all <br /> -3- KR257 88/07/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.