My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1452-88
>
Ordinances
>
Ordinance 1452-88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2018 10:00:30 AM
Creation date
1/2/2018 10:00:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1452-88
Date
2/24/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Environmental Impact Statement <br /> a. Submittal of Preliminary Draft EIS - Five Hundred <br /> Dollars ($500.00). <br /> b. Additional costs, if any, incurred by the City <br /> shall be billed directly to the applicant; no <br /> additional costs may be charged for existing <br /> studies or general information already in the <br /> possession of the City; and provided that in no <br /> event shall the cost for an EIS review exceed <br /> $2,000. No fee shall be required under this <br /> section for proposals primarily involving the <br /> construction of publicly subsidized housing. <br /> c. In the event that a proposal is modified so that an <br /> EIS is no longer required, the responsible official <br /> shall refund any costs collected for costs <br /> not incurred. <br /> 3. Detailed Environmental Study Review (review of additional <br /> studies; e.g. , detailed soils, traffic, drainage, air or <br /> water quality studies or other detailed environmental <br /> studies required to supplement an Environmental <br /> Checklist) - One Hundred Dollars ($100.00) in addition to <br /> Environmental Checklist fee. <br /> 4. The full fee for a threshold determination and/or an EIS <br /> shall be paid by the private applicant prior to the <br /> circulation of an EIS or Environmental Checklist by the <br /> City. <br /> 5. No fee shall be collected by the City for performing its <br /> duties as a consulted agency. <br /> P. Shoreline Master Program Amendment - Five Hundred Dollars <br /> ($500.00). <br /> Q. Shoreline Substantial Development Permit, Conditional Use or <br /> Variance <br /> 1. Project value of up to one-million dollars as determined <br /> by the Building Official - Three Hundred Fifty Dollars <br /> $350.00) <br /> 2. Project value of over one million dollars as determined <br /> by the Building Official - Three Hundred Fifty Dollars <br /> Dollars ($350.00) plus One Hundred Fifty Dollars Dollars <br /> ($150.00) for every one million dollar increase in value. <br /> R. Shoreline Permit Revision - One Hundred Fifty Dollars ($150.00) <br /> S. Short Subdivision <br /> 1. Short Subdivision Application for Preliminary Approval - <br /> Two Hundred Fifty Dollars ($250.00) plus Thirty-Five <br /> Dollars ($35.00) per lot. <br /> 2. Final Short Subdivision Approval - Five Dollars ($5.00) <br /> per lot. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.