Laserfiche WebLink
! • <br /> Kirk Brooks <br /> To: Charles Johnstone; Paul McKee <br /> Cc: Sabrina Fandler; Mike Papa;Jeff Kerwin; Mark Sadler <br /> Subject: RE: Sediment control plan- Evergreen Granite <br /> I reviewed this with Mark Sadler. He indicated that this may not be an item that we should allow being dumped in the <br /> sewer system. I suggest that we have Evergreen Granite cover their work is with a tent or such and berm the parking <br /> area to keep rainwater out of the cutting area.This will decrease the amount of water they have to deal with and help <br /> minimize potential for surface water contamination.They can deal with hauling off their waste material on a weekly <br /> schedule, that way they are required to deal with the situation on their own. Allowing an unsupervised connection to <br /> the sewer for this material only leaves the door open for misuse. That's my opinion, someone in charge please make a <br /> decision on this.Thanks, Kirk. <br /> From: Charles ]ohnstone <br /> Sent: Tuesday, August 09, 2016 3:11 PM <br /> To: Jeff Stewart <br /> Cc: Kirk Brooks; Sabrina Fandler; Mike Papa; Jeff Kerwin <br /> Subject: RE: Sediment control plan- Evergreen Granite <br /> Thanks for the information. Discharge from the settling/pretreatment system should be connected to the property's side <br /> sewer, or be routed to sewer through a fixture or drain on the property. Unless there is a suitable existing drain or <br /> fixture you will need a permit. And if so please do check with Engineering and Public Services (building/permitting folks- <br /> upstairs at 3200 Cedar St) in case some other submittal requirements may apply. <br /> Once installed, IPT requires users to perform regular maintenance on pretreatment systems, and staff must keep a <br /> record of any maintenance or repairs,typically for a minimum of three years. <br /> Please contact our office with any pretreatment questions or concerns. <br /> Charles Johnstone � ��""' <br /> Industrial Waste Inspector .\�• L <br /> Everett Public Works � �� <br /> 425-257-8240-8224 ��,� ��� <br /> From: Mike Papa r � <br /> Sent: Tuesday, August 09, 2016 11:29 AM <br /> To: JefF Stewart <br /> Cc: Charles ]ohnstone; Kirk Brooks; Sabrina Fandler <br /> Subject: RE: Sediment control plan- Evergreen Granite <br /> Thank you. You should come to the Building Department a get their blessing and/or a permit if needed before you do <br /> anything. <br /> From: Jeff Stewart [mailto:thestewartcoincC4�gmail.com] <br /> Sent: Tuesday, August 09, 2016 9:51 AM <br /> To: Mike Papa <br /> Cc: evergreengranite@yahoo.com <br /> Subject: Sediment control plan- Evergreen Granite <br /> Gentlemen. Attached is a drawing for the proposed sediment control plan. <br /> i <br />