Laserfiche WebLink
INSPECTION REPORT <br /> Date: 9 t A Permit: <br /> Contractor: <br /> Owner:_ <br /> Site A ss: )l0am a4 <br /> TYPE OF INSPECTION RL-uu 5(ED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Rough In/Service Hot Water Tank <br /> ❑Footing dr s eiling Grid efrigeration ❑ Rough In <br /> ❑Roof drains Building Final �n as Pipe Final ❑HWT Final <br /> OTHER O SULTAT NON: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Vr�b <br /> Inspecto Date. <br /> r'I rn, nn <br />