Laserfiche WebLink
I! <br /> 2. Oakes Avenue Bridge <br /> 1 <br /> a. Program 925, Preliminary Engineering Phase (W.O. #1687) <br /> Bridge Replacement Fund (Fed.) $ 73,600 <br /> Burlington Northern Railroad 18,400 <br /> � SUBTOTAL $ 92,000 $ 92,000 <br /> 11 <br /> 1 I <br /> I <br /> b. Program 925, Right-of-way (W.O. #2101) <br /> li I <br /> Bridge Replacement Fund (Fed.) $ 2,400 <br /> Burlington Northern Railroad 600 <br /> 11i <br /> , SUBTOTAL $ 3,000 $ 3,000 <br /> I{ <br /> c. Program 925; Railroad Flagging (W.O. #2111) <br /> Bridge Replacement Fund (Fed.) $ 20,000 <br /> Burlington Northern Railroad 5,000 <br /> 1 SUBTOTAL $ 25,000 $ 25,000 <br /> ii <br /> d. Program 925, Construction Phase (W.O. #2102) <br /> Bridge Replacement Fund (Fed.) $284,276 <br /> Burlington Northern Railroad 71,069 <br /> SUBTOTAL $355,345 355,345 <br /> TOTAL OAKES AVENUE BRIDGE FUND: $ 475,345 <br /> 3. Lombard Avenue Bridge <br /> li a. Program 926, Preliminary Engineer Phase (W.O. #1645) <br /> 1/2 Cent Gas Tax $ 1,285 <br /> Bridge Replacement Fund (Fed.) 56,000 <br /> Burlington Northern Railroad 12,715 <br /> SUBTOTAL $70,000 $ 70,000 <br /> 11 <br /> b. Program 926, Right-of-way (W.O. #2103) <br /> Bridge Replacement Fund (Fed.) $ 2,400 <br /> Burlington Northern Railroad $ 600 <br /> SUBTOTAL $ 3,000 $ 3,000 <br /> 1 <br /> -4- <br />