Laserfiche WebLink
� verizon� <br /> Assumptions <br /> 1.GC TO SUPPLY LABOR AND MATERIALS UNLESS OTHERWISE SPECIFIED. <br /> 2.GC TO CALL USA AND HAVE ALL UNDERGROUND UTILITIES LOCATED BEFORE DIGGING. � <br /> 3.ALL CABLE NEAR AND FAR END TERMINATIONS AND ALL ENDS OF MULE TAPE ARE TO BE LABELED FOR DARK FIBER <br /> PROJECT USE. � <br /> I 4.FOOTAGES ARE APPROXIMATE AND MAY DIFFER SLIGHTLY FROM ACTUAL LENGTHS.IF FOOTAGES ARE SEVERELY V I 1 1 C U I U 1 1 1 S <br /> DIFFERENT THAN SPECIFIED,BRING TO CONSTRUCTION MANAGERS ATTENTION IMMEDIATELY. <br /> 5.GC IS RESPONSIBLE FOR PROVIDING A CLOSEOUT PACKAGE(COP)TO CONSTRUCTION MANAGER WITHIN 48 HOURS OF <br /> COMPLETION,FOR ALL PRE AND POST CONSTRUCTION.AN APPROVED COP IS REQUIRED FOR ACCEPTANCE OF WORK �0 PnSTEUR SuiTE i o0 <br /> AND APPROVAL FOR PAYMENT. iRwNE, CnuPORwn 926i8 <br /> 6.GC IS RE�UIRED TO NOTIFY THE CONSTRUCTION MANAGER IMMEDIATELY OF ANY CHANGES REQUIRED TO COMPLETE <br /> THE SCOPE OF WORK.NO CHANGES OR MODIFICATIONS TO THE SOW SHALL COMMENCE WITHOUT APPROVAL FROM THE � <br /> CM.ANY ADDITIONAL COSTS ASSOCIATED WITH THE APPROVED CHANGES ARE DUEWITHIN 24 HOURS. <br /> 7.ALL GROUND LEADS ARE TO BE#6 AWG INSULATED WIRE.THHN/THWN INSULATED WIRE IS NOT TO BE USED IN ANY <br /> CELL SITES. <br /> 8.WHEN REQUIRED,NEW CABINETS ARE CUSTOMER SUPPLIED AND ARE TO BE PICKED UP BY THE GC AT THE CUSTOMER <br /> WAREHOUSE AND INSTALLED AS PART OF THE SOW. <br /> 9.ALL BUILDING PENETRATIONS SHALL UTILIZE PLASTIC BUSHINGS,LOCK NUTS,AND FIRE STOP/WATERTIGHT SEAL. <br /> 10.WHEN REQUIRED,ANY NEMA BOXES/CABINETS SHALL UTILIZE A MEYERS HUB TO MAINTAIN NEMA RATING. <br /> 1L WHEN REQUIRED NEW DC POWER FROM POWER PLANT TO GMT FUSE PANEL IS TO BE INSTALLED ON TOP OF LADDER II <br /> RACK.BREAK OFFS ARE TO BE SECURED TO THE LADDER RACK STRINGER AND NOT RUN BETWEEN THE LADDER RUNGS. <br /> TWO LAYERS OF FISH PAPER ARE TO BE USED ON RACK STRINGER AT ALL BREAK OFF POINTS. <br /> ' 12.WHEN REQUIRED,ALL+24VDC DROPS SHALL BE REDUNDANT,UTILIZING TWO BLACK AND RED WIRE FOR+/- <br /> DESIGNATION.WIRE SIZE TO BE USED IS DESIGNATED IN THE SOW. <br /> p 9/29/2016 <br /> I13.ALL CONDUITS WILL UTILI2E PVC SCHEDULE 40 FOR UNDERGROUND,PVC SCHEDULE SO ABOVE GROUND OR UNDER REv DATE DESCRIPTION <br /> i DRIVEWAYS AND AREAS THAT WILL HAVE VEHICULAR TRAFFIC.ANY PVC USED ABOVE GROUND MUST HAVE ALL GLUE <br /> I STREAKS WIPED OFF AND CLEANED.NO GLUE RUNNING DOWN THE CONDUIT. <br /> I�I 14.ALL TRENCHES ARE TO BE LOCATED WITHIN EXISTING EASEMENT UNLESS PRE-AUTHORIZED. <br /> I 15.ALL GROUND SURFACES TO BE RESTORED TO THEIR ORIGINAL CONDITION USING NATIVE MATERIALS. <br /> I 16.ALL NEW HAND HOLES WITH TRAFFIC RATED LIDS REQUIRE TRAFFIC RATED BOXES. <br /> 17.GC TO SECURE(N)INNERDUCT TO UNDERSIDE OF CABLE RACK OR SIDE/TOP OF CABLE RACK USING NINE CORD.GC TO <br /> PROTECT INNERDUCT AT EVERY SECURING POINT WITH 2 LAYERS OF FISH PAPER. <br /> 18.ALL BURIED WYE-CASTS MUST BE ENCASED IN CONCRETE. <br /> 19.POC/HH 17X 30 IS TO BE PLACED AGAINST THE ROW.IF FOR ANY REASON THE POC/HH NEEDS TO SET MORE THAN 12 <br /> AWAY FROM THE ROW;INSTALL A 4"PIECE OF CONDUIT WITH INNERDUCT FROM POC/HH TO ROW,CAPPED,AND MARKED n is�hounor+ov uw voa uar aeasoN. <br /> i FOR FUTURE LOCATION BY FIBER PROVIDER. uN�ss rnEr uie ncnNc uNoeR rr+E oiaEcnoN <br /> OF A LICENSED PROFESSIONAL ENGINEER,T� <br /> ALTER THIS DOCUMEM <br /> 20.ANY DEVIATION FROM THE SOW,WILL REQUIRE ADDITIONAL REVIEW BY REAL ESTATE AND THE CONSTRUCTION <br /> j MANAGER. 103263 <br /> I 21.ALL WORK IS TO BE REFERRED TO AS MAINTENANCE. DAGMAR <br /> II 22.YOU MUST CONTACT THE LL 48 HOURS PRIOR TO GOING ONSITE.CONTACT INFO WILL BE PROVIDED IN THE NTP. 1871 ROSS AVE <br /> II EVERETT, WA <br /> 23.IN THE EVENT THE FIBER CARRIER HAS INSTALLED THEIR MEET ME POINT PRIOR TO THE GCS ARRIVAL IT IS THE GCS I <br /> RESPONSIBILITY TO CONNECT TO THE FIBER CARRIERS HH OR STUB OUT AS APPLICABLE.THIS WILL INCLUDE BUT NOT ShEET TiT�E <br /> LIMITED TO INCLUDE THE USE OF CONDUIT,MAXCELL,ANDIOR INNERDUCT TO PROTECT THE FIBER. <br /> SITE INFO/SOW/PHOTOS <br /> SHEEf NUMBER <br /> B�� .� <br /> ASSUMPTIONS 1 �� <br /> � � <br />