Laserfiche WebLink
. 2015 Washington State En Code Compliance Forms for Commercial,R2 and R3 ov stories and all R1 -Page 7 of 7 <br /> . . <br /> 2015 Washington State Energy Code Complia�ce Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> ProjectTitle: 4312Rucker-CampfireUSA Date 1/1/2015 <br /> The following information is necessary to checF:a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial F'rovisions. <br /> Applicable Code Section Code Provi:sion Information Required-Must be in permit documents Location in Building Department <br /> (yes,no,na) Documents Notes <br /> C403.7, Application of single duct Indicate VAV terminal types on plans;verify fan-powered terminal units only serve perimeter <br /> Item 11 and fan-powered terminal Zones with envelope loads;verify all other zones are served by single duct terminal units <br /> units <br /> C403.7, Fan-powered terminal unit Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint <br /> Item 12 primary air reset of all fan-powered terminal units to the minimum required to maintain ventilation during <br /> occupied heating or deadband,based upon the VAV air handling unit OSA ventilation fraction <br /> For spaces>150 sf with occupant density>_25 people/1000 sf,indicate space is served by a <br /> C403.7, High occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint;also <br /> Item 13 controis indicate occupancy sensor control that automatically reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by?5°F <br /> For server,electronic equipment,telecom or similar spaces with cooling loads>5 W/sf, <br /> C403.7, indicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 Dedicated HVAC systems s stems servin rest of buildin <br /> y g g;indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant <br /> If complying via high efficiency heating water plant:Indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fred boiler(s)with thermal <br /> C403.7, efficiency>_90%,air-to-water heat pumps,or heat recovery chillers <br /> Item 15 Central plant efficiency - ---- <br /> If complying via high efficiency chilled water piant:Indicate all VAV air handlers have cooling <br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C403.2.3(7)(note water-cooled IPLV is max,all others are min);indicate <br /> smallest chiller or compressor in plant is<_20%of total plant capacity,or provide thermal <br /> storage sized for<_20%of total plant capacity <br /> C403.7, Fault detection an�i Indicate DDC system includes a fault detection and diagnostics(FDD)system confgured to <br /> Item 16 diagnostics monitor operation and provide fault reporting of required parameters for all VAV air handlers <br /> and VAV air terminal units in the HPVAV system <br /> HVAC Equipment Energy Use Metering <br /> HVAC equipment��nergy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of <br /> C409.3.1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment eligible for exception <br /> Documentation and System Specific Req��irement To Support Commissioning <br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires <br /> control functions and !or configuration to perform specific functions are required to be <br /> commissioned; <br /> Scope of inechani�al <br /> C408.2 systems commissioning For buildings with>_240,000 Btu/h total output cooling capacity or?300,000 Btu/h total output <br /> heating capacity,indicate that all mechanical systems regardless of individual capacity are <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception <br /> Indicate in plans and specifcations that Cx per C408 is required for all applicable mechanical <br /> systems; <br /> C4032.10 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br /> C408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6,and conFlict of <br /> C408.1.42 documents interest plan(if required); <br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the fnal mechanical inspection. <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> C408.2.2 system balancing defined in the specifcations;indicate systems shall be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions <br /> C40822.1 Air system balanci�g Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing <br /> C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> C408.2.3 Functional performance Identify in plans and specifcations the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and existing-to-remain systems <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> C103.6 close out submittal personnel is required for all mechanical components,equipment and systems governed by <br /> requirements this code;indicate close out documentation shall include:record documents,O&M manuals, <br /> applicable WSEC compliance forms and calculations <br /> q � �.� ,f� <br /> _.�r <br /> �� <br />