Laserfiche WebLink
1 <br /> ` � • <br /> • <br /> � G�,�� c�ou� � � 5 � z- L �� <br /> (�eotechnical Consulting <br /> August 28, 2015 <br /> TGG Project 1841-1 <br /> MJ Donovan-Creamer <br /> Robert Creamer <br /> 2616 Baker Avenue <br /> Everett, WA 98201 <br /> Subject: Geotechnical Reconnaissance Report <br /> 2616 Baker Avenue <br /> Everett, Washington <br /> Dear MJ and Robert: <br /> At your requcst, the Galli Group performed a geotccluiical assessment of the property located at <br /> 2616 Bakcr Avenue iu Evcrctt, Washiilbton. Tl1e purposes of our rcview and sitc visit were to <br /> evaluatc thc sitc soil conditions, and to providc rccommcndations for foundatio�l s�ipport of thc <br /> replaced foundation. in the letter bclow we have providcd gcotechnical recommcndations <br /> rclated to tl�e proposed improvements. <br /> Project DescNiption <br /> The project site is locatcd on the west side of Baker Avcnue in Everctt, north of the intersection <br /> with Everett Avenue. The cxisting hotise is supported o» post and pier foundations and includes <br /> a more recent addition supported on conventional sprcld footings. The portion of the 100-ycar <br /> old hoLlse supported on post and pier foundations has settled unevenly and particularly at the NE <br /> corner of the residence. Differential settlement on the order of 4 inches was observed in the <br /> house. <br /> The proposed foundation repair/replacement includes constructing a new perimeter foLindation <br /> and interior strip footings to support the cxistin�house. We anticipate constniction of <br /> conventional concrete foundations with concrete stem walls. Excavation for the footings will be <br /> on thc ordcr of about 3 feet below existing gradc. Footings will bc supportcd on native, <br /> undisturbcd glacial soils. <br /> PO Box 30759,S�ttle,W4 98113 Phor�e: 206.525.5097 <br /> , j <br /> � <br /> , <br /> � '� <br />